Gengetatu ExtechGengetatu Extech

Our Operations

From exploration to processing, our operations combine modern techniques with rigorous safety and environmental standards.

How We Mine

01

Exploration

Our geologists identify and assess gold-bearing structures across our licence areas using surface mapping, drilling, and sampling to define resource potential before any extraction begins.

Geologist examining the soil profile in an exploration trench
02

Extraction

Ore is extracted from our mining sites using a combination of open-pit and underground methods suited to each deposit, with safety and ground stability as the first priority at every stage.

Team beside crushed ore at a Gengetatu Extech mining site
03

Processing

Extracted ore is crushed, milled, and processed on-site to concentrate the gold-bearing material, using techniques designed to maximise recovery while managing water and tailings responsibly.

Aerial view of the CIP processing plant at Mbangala

Our Sites

Geita Mpomvu Site

Geita Mpomvu Site

Active

Geita, Tanzania

70 tonnes-per-day CIP processing plant, operational and active since 2018.

Songwe Operation (Mbangala Village)

Songwe Operation (Mbangala Village)

Under Construction

Mbangala Village, Geita Region

300 tonnes-per-day CIP plant with over 400,000 tonnes of ore available. TSF construction is underway and the plant is approximately 98% complete, with production expected by end of 2026.

Interested in our operations?

Get in touch with our team to learn more about our sites and processes.

Contact Us